Market data
Awarded Government Contracts
Real Award-of-Contract records from government e-procurement portals — see who won, for how much, and when. 459 contracts and growing.
Construction of RCC Drain in shakti mandir road from bihari lal chowdhry shop to gurudwara via punjab sweets,lal pathlabs and gol building to main Drain Via Dumariyatand Road and link gali and different location in ward no.31, Under DMC Dhanbad.
Construction of big drain in Manaitand temple road pull (near Bhagat ji mandir) to Gandhi nagar near nand kishor Bhagat house and link drain in ward no 30 under DMC Dhanbad
Construction of road aziz nagar (1)rizwi lawyer to albaik hotel , construction of road and darin from dimpi house to mother heleema boundry,(2) Construction of road near umar masjid md nasir to alimansari house (3) Construction of road from r.k.marr
Construction of Road in kenduadih basti shiv mandir tola to bhutgaria pool via harijan tola and petia main road to hanuman mandir bandh tola and in bhagabandh basti from indian academy school to durga mandir via 17 no. and in kachi balihari from sara
Repair and maintenance of Control Room building at 220/132 KV G/S/S, Hatia-II
Construction of RCC drain in telephonic exchange Road near Vinayaka netralaya corner point to the direction of Hari Gopal Majumdar cross near transformer to Satya micro capital limited Dhanbad office building bike side and different location and ward
Construction of RCC Drain in Sindri college road from MK1 Colony to MK16 , Gaushala Bajar deepu sahu house to gopal sahu house , Malik basti from Goutam banerjee house to, Nutandih basti from manoj yadav to suresh mahato,Kandra Shivsakti Neemtoli fro
Construction of Drain in Gujrati mohalla from Waykund building to Saroj apartment via Manish borra house and culvert and different locations in ward no. 32 under DMC, Dhanbad.
Construction of drain in Bhuli, sector-5,E Block,from Anil electronics shop to dairy farm, from Bhola chauhan shop to usha mehta house, sunil paswan house to sec 5 main road drain, scarpio tea stall to vishal sinha house, Razzak house to sarshwati sh
Construction of Drain in E block sector 2 Bhuiyan basti, from Dr. K B Hedgewar road to main drain via New Market, from Datta sweets to main drain. And from kumbhkaran house to karan Bhuiyan house and Subhash das house to binod Bhuiyan house and from
Construction of RCC Drain in Manohar tand Hirak road from Bharat Mahto house to Pramukh Singh house near culvert via Veer Singh, Monu Kumar in ward no. 53 under DMC, Dhanbad
Construction of PCC road in Bhuli E block, sector 1to sec 5 in different locations and in D block sector 3 and sector 4 in ward 15 under DMC, Dhanbad.
Construction of Drain in Shakti Nagar Colony From Ananad Singh house to Culvert via Indu Devi House at Main Road (b) In Bhelatand Aditya nagar Hirakroad From Anil singh house to Mahindra Pratap (c) In Saridhela Sital Samudra Tower to Savitri Niwas an
Construction of Drain from baba Clinic to temple both side and shiv temple to main drain near NH in old katras topchanchi road in ward 01 under DMC Dhanbad
Desilting, uprooting of jungle and shrubs including repair and restoration work of canal from km 17.220 to km 29.830 of KRMC
Construction of PCC road from Savitri Murmu to Usha Toppo house under ward No-10
Construction of RCC Drain at sattar colony road no-03 from fatima store to jora talab existing drain under Ward no- 09
Construction of Road from Panchayat Bhondo Village Piprahi PWD road to Madarsa via Nawadih REO Road (L-1.700Km.)
Construction of Pcc Approach road at Saidup, Ukamar, Morwai, Juruhar, Mundu Mangra Ayushman Arogya Mandir Block Barwadih Distrct- Latehar.
construction of 1 nos of HYDT,installation of 1 numbers of 1.5HP submersible motor pump , cable, rising main , 1 nos of protection chamber etc at Community Health centre Kuchai , Saraikela under D. W. S Division Saraikela
Supply and installation of 1.5 Ton 3 star split type Air Conditioner for Annexe building in the campus of existing Hq Building including Accessories and Stabilizer of Sen pandi/ V-Guard or equivalent make of ISI mark of JUSNL HQ at Kusai Colony
Construction of 100ft PCC Road from the lower end of Purana Adiwasi Tola up to the school under Murgabani Panchayat (2) Construction of PCC road from Manik Thakur house to Khokhin Bauri house at Bauri tola Chihatibad under Barwa Panchayat others
Construction of PCC road from Puliya to Bargad Tree in Village Kharhara, Block Jama Distt-Dumka.
Installation of a solar-powered water tower at the hand pump next to the road leading to the late Mustaq house under Godtopa Panchayat (2) Installation of a hand pump next to the road in front of Lal Babu house under Bariyo Panchayat
Sourced from official government e-procurement Award-of-Contract records. Figures are the awarded contract value; verify on the official portal before relying on them. GeM tenders are excluded — their award prices aren't publicly listed.