Awarded contractOfficial Award-of-Contract recordContract date · 6 Oct 2026
Construction of Paver block road including Protection wall at various locations of ward No 12 under the Udaipur Municipal Council UMC_UDP_2026_27. TL 150.80 m.
Director (Urban Development Department) · Tripura
- Department
- Director (Urban Development Department)
- State
- Tripura
- Contract date
- 6 Oct 2026
- Winning bids
- 1
More from Director (Urban Development Department)
105 in totalThe same buyer goes to market repeatedly — these are its other awarded contracts.
- Construction of Paver block road including Protection wall at various locations under the ward no 11 UMC_UDP_2026_27. Length of P wall 150.00 m and Length of Paver block road 150.00 m.Tripura · 1 Oct 2026₹7,59,532
- Construction of Paver block road including Protection wall at various locations under the ward no 21 UMC_UDP_2026_27. Length of P wall 150.00 m and Length of Paver block road 150.00 m.Tripura · 1 Oct 2026₹7,59,532
- Mtc. of masonry drain and construction of RCC slabs near the corner of the house of Iman Ulla Kaji to Nirmal Das at ward no 20 UMC_UDP_2024_25 Total Length 130.00 m.Tripura · 1 Oct 2026₹5,85,064
- Construction of Paver block road including Protection wall at various locations of ward No 08 under Udaipur Municipal Council UMC_UDP_2026_27. TL 134.80 m.Tripura · 1 Oct 2026₹10,61,033
- Construction of Paver block road including Protection wall at various locations under the ward no 20 UMC_UDP_2026_27. Length of P wall 150.00 m and Length of Paver block road 150.00 m.Tripura · 1 Oct 2026₹7,59,532
- Construction of masonry drain including RCC slab and paver block road from Jalekha Bibi to the house of Suhel Akhtar Chowdhury at ward no 19 under Udaipur Municipal Council during the year 2026_27 Total Road Length 62.50 m Drain Length 54.00 m.Tripura · 1 Oct 2026₹5,35,726
Also won by DIP NARAYAN KAR
Other contracts this firm has won — who you would be bidding against.
- Construction of RCC drain with cover slab and paver block road from house of Ranjit Majumder to house of Milan Debnath under ward no_12_UMC_UDP_2026_27 Total length 83.70 m.Tripura · 29 Sept 2026₹8,61,432
- SH- construction of base, RCC column, extension of DI pipeline upto the existing sch in/c other allieds works for 08nos re-sinking site of DTW under KBN DWS S/D during the yr 23-24.Tripura · 11 Sept 2026₹24,46,234
Source
Captured from the official Award of Contract record on the government e-procurement portal (Tripura). Tender reference 2026_Urban_76135_1.
Open the government portal ↗This is a completed (awarded) contract shown for market reference — what the government actually paid for this work. Always verify on the official portal. Bidrove is an independent platform, not affiliated with any government authority.