Awarded contractOfficial Award-of-Contract recordContract date · 18 Aug 2026
Construction of Paver Block road including masonry drain with cover slab I. from the house of Debadrita Paul to the house of Kanan Karmakar II. fron the PWD road to the house of Susanta Saha at Ward No_11 UMC_UDP_2025_26 2025_26 Length of drain 85.00
Director (Urban Development Department) · Tripura
- Department
- Director (Urban Development Department)
- State
- Tripura
- Contract date
- 18 Aug 2026
- Winning bids
- 1
More from Director (Urban Development Department)
114 in totalThe same buyer goes to market repeatedly — these are its other awarded contracts.
- Road restoration work at different roads under S.B. Section within the jurisdiction of AMC Central Zone Area (12 nos. ward) under DWS Sub Division No I Collegetilla after completion of different DWS pipeline works including Mtc workTripura · 16 Oct 2026₹25,60,964
- Formation of road from PWD road to Birendra Das house via Krishna Das house S.H- Brick Soling, retaining wall, cross drain at ward no-2 under Sabroom Nagar Panchayat during the year 2026-27.Tripura · 15 Oct 2026₹8,54,707
- Construction of Paver block road including Protection wall at various locations under the ward no 04 under UMC_UDP_2026_27. Total Length of P wall 150.00 m and Length of Paver block road 150.00 m.Tripura · 15 Oct 2026₹7,59,491
- Construction of RCC Road with side wall in/c cover drain from by-pass road to Patit Ghosh Ward no 07, of Kamalpur Nagar Panchayat, Dhalai Tripura, during the year 2025-26Tripura · 14 Oct 2026₹12,27,509
- Construction of cover slab for existing drain including paver block road with protection wall at various spots a. From PWD road to the house of Ranjit Pal b. From PWD road to the house of Anup Das at ward No 20 under UMC_UDP_2025_26. Length of P wallTripura · 13 Oct 2026₹2,82,704
- Construction of Paver Block road including Protection wall at various locations under the Ward No 23 UMC_UDP_2026_27. Length of Pwall 150.00 m and length of Paver Block road 150.00 mTripura · 8 Oct 2026₹6,08,930
Also won by DIPANKAR DAS
Other contracts this firm has won — who you would be bidding against.
- Construction of paver block road with masonry drain including a protection wall from the house of Rana Lodh to the house of Rajib Som at ward no_05_UMC_UDP_2025_26 Length of drain 122.00 m Length of protection wall 97.00 m and Length of paver blockTripura · 29 Sept 2026₹10,65,707
- SH Yearly Repairing and Running maintenance and Complete Rewinding damaged burnt pump and Submersible motor under different DTW SBDTW schemes Electrical Features of DWS Sub-Division, Mohanpur 2026-27Tripura · 10 Aug 2026₹10,40,996
- Maintenace of CC Road drain and construction of slab from ABC Lane to Samir Datta via Anil Chakraborty under ward no_11_UMC_UDP_2025_26 Total Length Drain 61.00 m and No of slabs 60 Nos.Tripura · 14 May 2026₹2,73,537
Source
Captured from the official Award of Contract record on the government e-procurement portal (Tripura). Tender reference 2026_Urban_74290_1.
Open the government portal ↗This is a completed (awarded) contract shown for market reference — what the government actually paid for this work. Always verify on the official portal. Bidrove is an independent platform, not affiliated with any government authority.